Canadian Solar Panel Manufacturing Facility
Mesquite, TX
Located in Cherry Valley, Illinois, this new $29,100,000 food and beverage facility was developed by VentureOne Real Estate and built by Clayco. This state-of-the-art facility includes a 4,700 SF 0-degree freezer, 8,400 SF 35-degree cooler, 40 loading dock positions and 5,200 SF office space.